Skip to content
AfterDemo

Free tool · no sign-up

Pipeline coverage calculator: is your pipeline enough to hit target?

Enter your quarterly target, what you've already won, your open pipeline and your win rate. You get your pipeline coverage ratio, the coverage your win rate actually needs, what the quarter is likely to land at, and how much pipeline to add while there's still time for it to close. It runs in your browser and nothing is saved.

  • Pipeline coverage is open pipeline divided by what's still left to win this quarter.
  • The coverage you need is 1 divided by your win rate: 3x is only right if you win about a third of your pipeline.
  • New pipeline has to start at least one sales cycle before quarter end, or it builds next quarter instead.
  • When it's too late to add pipeline, the quarter is decided by how much of the open pipeline you win.
$
$

The value of open deals that could still sign before quarter end

$
25%

The share of open pipeline you usually win

$
45
30 days

Days from the demo to a signed deal

Your pipeline coverage

Example: change any number

2.7x

Not enough yet

$400,000 of pipeline for the $150,000 still to win. At a 25% win rate you need 4.0x.

Likely from pipeline
$100,000
Projected quarter
$150,000
Of target
75%

To cover what’s left

Add $200,000 of pipeline: about 17 new deals at $12,000.

That takes you to $600,000 of pipeline, 4.0x the $150,000 still to win.

Mind the calendar. New deals have to start in the next 15 days to sign this quarter. After that, new pipeline builds next quarter.

Or raise the win rate: at 38% you’d cover it with the pipeline you have.

Coverage is only as good as the deals behind it. AfterDemo shows who’s reading each proposal, so you know which pipeline is real.

Start free

Worked out in your browser. Nothing you enter is sent or saved. Need the demo math instead? Try the sales target calculator.

Pipeline coverage answers one question early enough to do something about it: is there enough in the pipeline to hit this quarter's number? This calculator works it out from your own win rate instead of a rule of thumb, shows what the quarter is likely to land at, and tells you how much pipeline to add and how many days you have left to add it. For the demo-by-demo version of the same plan, use the sales target calculator.

How the calculator works

  • What's left to win = target − already won.
  • Pipeline coverage = open pipeline that can close this quarter ÷ what's left to win.
  • Coverage you need = 1 ÷ your win rate on open pipeline.
  • Likely from pipeline = open pipeline × win rate, and the projected quarter adds what's already won.
  • Pipeline to add = (what's left ÷ win rate) − the pipeline you have.
  • Days to create it = days left in the quarter − your sales cycle.

Why 3x isn't a rule

"Keep 3x pipeline coverage" is the most repeated number in sales planning, and it's only right for a team that wins about a third of its open pipeline. A team that wins a quarter of its pipeline needs 4x. A team that wins half needs 2x. If you plan on 3x with a 25% win rate, you'll feel covered and still miss. Measure your win rate on open pipeline over the last two or three quarters and use that.

A worked example

A made-up team at Tallyfox, a fictional scheduling-software company, has a $200,000 target this quarter and has won $50,000 so far, so $150,000 is left. They have $400,000 of open pipeline that could close this quarter, and they usually win 25% of it.

Their coverage is about 2.7x, but at a 25% win rate they need 4x. Their pipeline is likely to bring in $100,000, so the quarter lands near $150,000: 75% of target. To cover what's left they need $600,000 of pipeline, so they should add $200,000, about 17 new deals at $12,000. With 45 days left and a 30-day sales cycle, those deals have to start in the next 15 days.

What to count as pipeline

Count open deals that could realistically sign before quarter end: a demo has happened, the buyer knows the price, and there's a next step on the calendar. Leave out deals that slipped twice already, deals waiting on a budget that doesn't exist yet, and anything whose close date is next quarter. Use the full deal value, not a weighted one: the win rate does the discounting.

What to do with the answer

If you're covered, stop counting pipeline and start moving it. Every deal needs a clear next step with a date, and the people who sign need to have seen your proposal.

If you're short and there's time, add pipeline now. A demo booked next month won't sign this quarter.

If it's too late for new pipeline, the quarter is decided by your win rate on what's open. That's where a proposal the whole buying team can read, a business case for the approver and a well-timed follow-up earn their keep.

Clean the pipeline first. Coverage is only as honest as the deals behind it. Take out anything that can't close this quarter and anything nobody has engaged with in weeks.

Know which pipeline is real

AfterDemo turns each demo into a proposal page and shows you who opened it, what they read and who they shared it with. So when you count your coverage, you know which deals are moving and which are only hoped for. See a live example, or start free for 30 days.

Questions people ask

What is pipeline coverage?

Pipeline coverage compares the value of your open pipeline with the revenue you still need to win. If you have $400,000 of open deals and $150,000 left to win this quarter, your coverage is about 2.7x.

How do I calculate pipeline coverage?

Subtract what you've already won from your target to get what's left. Then divide your open pipeline, counting only deals that can still close this period, by that number. The pipeline coverage formula is: open pipeline ÷ (target − won).

Is 3x pipeline coverage enough?

Only if you win about a third of your pipeline. The coverage you need is 1 divided by your win rate on open pipeline: 4x at 25%, 3x at 33%, 2x at 50%. Use your own win rate, not the rule of thumb.

What's a good pipeline coverage ratio?

One that's at or above 1 ÷ your win rate, with enough time left for those deals to sign. A high ratio full of deals nobody has engaged with in weeks is weaker than a lower ratio of active ones.

Should I use weighted pipeline instead?

Weighted pipeline multiplies each deal by a stage probability, which is a forecast. Coverage is a simpler health check: is there enough pipeline at all? Use coverage to decide whether to prospect harder and a weighted forecast to call the number.

Send this as a live AfterDemo proposal

Free for 30 days. No credit card. Your prospects never need an account.

Start free